Showing posts with label ElectroHemp. Show all posts
Showing posts with label ElectroHemp. Show all posts

Sunday, March 20, 2016

ElectroHemp Hazardous Waste Remediation Intro

ElectroHemp BioRad Hazardous Waste Cleanup Introduction


ElectroHemp - BioRad CleanUp
5 Stage Phytoremediation Treatment Train - Removes Heavy Metals from the Soil faster than phytoremediation alone
Fact: 30,000 Superfund Sites in the USA full of toxic substances which have harmful and negative life changing effects on Human, Animals, and the Natural Environment.
1 in 6 Live Near a Hazmat Location


ElectroHemp BioRad CleanUp is a green remediation implementation strategy and process to clean up Hazmat Locations and Superfund sites in the St Louis Region and beyond.


ElectroHemp Natural and Organic BioRad Hazardous Waste Removal.
  1. Phytoremediation
  2. Electro-Horticulture
  3. Beneficial Soil Microbes
  4. Toxic Eating Micro Fungi
  5. Contain and Detoxify Soil and Water
5 Stage Treatment Train Speeds Up the Toxic Removal Process


Highlights


  • Grow plants that clean soil and are a source of sustainable biomass energy


  • Utilize Electro-Horticulture to speed up the movement of heavy metals and toxins within the soil


  • Encourage the growth of Microbes and Micro Fungi that aid in eliminating heavy metals and soil toxins

  • Address Water Pollution by containment and filtration


  • Solar PV and Sustainable Biomass resources provide “on-site” energy needs
Electromigration is the forced movement of Heavy Metals in the Soil by Electro-Horticulture
Electromigration is the forced movement of Heavy Metals in the Soil by Electrokinetics





KEYS: Electrokinetics directs the heavy metal toxins to a central point where plants phyto-extract the toxins.  Electrokinetics increases soil vitality which allows plants to grow bigger, healthier, and cycle more toxins from the soil.


 In the next post will explain how the 5 stage treatment train- Contains and Controls the harmful nuclear radiation safely.

Thursday, March 17, 2016

Heavy Metal Pollution Nuclear Waste Disposal that Generates Electricity

Diagram ElectroHemp BioRad Hazardous Waste Disposal system that generates Electricity 
I'm going to get honest with this post. I feel that most of the phytoremediation studies and systems fall short on the disposal of the contaminated plant materials which were used to soak up the heavy metals within the plants with or without the assistance of electrokinetics that speed things up.

When the ElectroHemp team was researching and perfecting our system of Heavy Metal removal system- we realized we did not want to add to the growing problem of where to put Radioactive Plant Materials in Long-Term Storage as suggested in 90%+ of all the studies we researched.

There has to be a better way and system for what to do with the toxic plant materials. Since the team is comprised of out-of-the-box thinkers who do not follow those who say it can't be done. We developed the BioRad Disposal tanks that address and solve the Long-Term Storage issue.

ElectroHemp Nuclear Waste BioRad Disposal & Clean Energy Generator System
ElectroHemp Nuclear Waste BioRad Disposal-Clean Energy Generator System
ElectroHemp BioRad Nuclear Waste Disposal that  Generates Electricity for Grid Tied or Off-grid Clean Energy from Nuclear Waste and Heavy Metals.

Search This Blog

ElectroHemp Introduction

ElectroHemp Hazardous Waste Remediation Intro

ElectroHemp BioRad Hazardous Waste Cleanup Introduction ElectroHemp - BioRad CleanUp 5 Stage Phytoremediation Treatment Train - Remove...